Rental Minimum Standards Victoria: 6 Energy Upgrades from 2027

What are Victoria's rental minimum standards, and what new energy upgrades are coming from 1 March 2027?

Victoria’s minimum standards set the conditions rental providers must meet. Six new energy standards start in phases from 1 March 2027: heating, cooling, hot water, shower heads, ceiling insulation and draughtproofing. Different lease and appliance-failure triggers apply, so you do not have to replace everything at once.

Figures as of November 2026. Updated 13 November 2026.

In this guide
  1. What are Victoria's rental minimum standards, and what new energy upgrades are coming from 1 March 2027?
  2. The 6 new energy standards
  3. Which standards apply to your rental?
  4. What about the existing 14 minimum standards?
  5. Can VEU help with the upgrades?
  6. Official sources
  7. Related SettleAU guides

The 6 new energy standards

The new standards are law under the Residential Tenancies Regulations 2021, amended by S.R. No. 63/2025. Check the trigger as well as the start date.

UpgradeWhat triggers itStart dateWhat is required
HeatingFailed fixed heater cannot be repaired1 March 2027Efficient fixed electric heating
CoolingNew agreement, conversion to month-to-month, or irreparable fixed cooler1 March 2027Efficient fixed cooling; all rentals from 1 July 2030
Hot waterSystem permanently fails and cannot be repaired1 March 2027Efficient heat pump or electric-boosted solar
Shower headsNew agreement or conversion to month-to-month1 March 20274-star WELS; 3-star if plumbing cannot take 4-star
Ceiling insulationNew agreement or conversion to month-to-month1 March 2027R5.0 where there is no insulation
DraughtproofingNew agreement or conversion to month-to-month1 July 2027External doors, windows and unsealed wall vents

Which standards apply to your rental?

  • Right now: check the rental already meets existing minimum standards, including a working compliant fixed heater in the main living area.
  • From 1 March 2027: a new rental agreement or a fixed term converting to month-to-month triggers cooling, shower heads and ceiling insulation requirements.
  • From 1 March 2027: irreparable failure triggers the new heating and hot water replacement rules. A working compliant heater can stay.
  • From 1 July 2027: a new agreement or conversion to month-to-month triggers draughtproofing.
  • From 1 July 2030: cooling applies to all rentals, regardless of lease status.

Use the key dates timeline to plan, then read the renter checklist for repairs and requests.

What about the existing 14 minimum standards?

The existing minimum standards cover 14 categories, including locks, kitchen, bathroom, structural soundness, mould and damp, electrical safety, ventilation and heating. They have applied since 29 March 2021. The property must meet minimum standards when advertised and before move-in.

Check CAV’s complete minimum standards list for the requirements beyond energy upgrades.

Can VEU help with the upgrades?

CAV says every upgrade under the new standards is eligible for a VEU discount. Eligibility, products and provider requirements still matter. See VEU discounts for renters and landlords and the rental laws FAQ. Contact an accredited provider before buying or installing.

Official sources

Figures as of November 2026. This guide uses the fact sheet built on 13 November 2026. Source dates are listed below; a page update does not mean every source was re-checked that day.

General information only: This guide is not legal or financial advice and is not from a government agency. Check the official sources and ask CAV or Tenants Victoria about edge cases.